This web shop is for our B2B partners.
Register and enjoy a range of benefits:
- - best purchase conditions
- - simple and fast order
- - insight into order history
Details filter
Loading...
This web shop is for our B2B partners.
Register and enjoy a range of benefits:
We offer solutions for safe and reliable power distribution: wide range of products for power distribution, protection, control and control of low and medium voltage electrical systems. The products and solutions from this segment are designed and constructed to enable efficient use of electricity.
Automatic changeover switch ATyS g M, 4P, 160 A
Currently available:
< 5
Availability:
12-15 days
Automatic changeover switch ATyS g, 4P, 200 A
Currently available:
0
Availability:
12-15 days
Automatic changeover switch ATyS g, 4P, 250 A
Currently available:
< 5
Availability:
12-15 days
Automatic changeover switch ATyS g, 4P, 400 A
Currently available:
0
Availability:
12-15 days
Automatic changeover switch ATyS g, 4P, 630 A
Currently available:
0
Availability:
12-15 days
Capacitor, 3-phases 10 kVAr, 440V, IP20
Currently available:
9-18
Availability:
10-15 days
Capacitor, 3-phases 14 kVAr, 440V, IP20, terminal connection
Currently available:
9-18
Availability:
10-15 days
Capacitor, 440V, 28,1kVar, 84mm
Currently available:
100 - 200
Availability:
days
Capacitor, 3-phases 20 kVAr, 525V, IP00
Currently available:
>20
Availability:
15-20 days
Terminal actuation tool SoftFinish 3,5x0,5, 3023
Currently available:
5-10
Availability:
na upit days
Mounting base, 19x19 mm, max cable tie width: 3,6 mm
Currently available:
500-1000
Availability:
15-20 days
Brtva za korištenje s vratima i regulatorom
Currently available:
18-20
Availability:
1-2 days
Ova stranica koristi kolačiće kako bismo vam osigurali najbolje moguće iskustvo na stranici. Kako biste nam dali do znanja da ste suglasni s korištenjem kolačića, molimo vas kliknite na gumb Prihvaćam
Wanted quantity of this product is currently not available. You can still order wanted number of products, but the shipping time may change.
Order anyway?